Details: earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. a. all kinds of soils. depth upto 1.50 m;providing, lowering, laying, jointing, testing and commissioning of glazed stone ware pipes of following dia, conforming to is 651:1992, is 4127 with latest amendments, including conveying to work site, caulking with dipped in tar and jointing with cm 1:1.5 using opc, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per technical specifications. t
Sector: Municipality