Details: cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications for:.cutting asphalt road surface by machine cutting to demarcate the trench width of the surface. ---- with all lead and lift loading and unloading as per the direction of engineer in charge;earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.depth exceeding 1.5 m, but not exceeding 3 m ---- with all lead and lift loading and
Sector: Social Development