Details: t01-tulsia to bibiganj providing & fixing of working benchmark pillars 2 nos. per km & 6 nos. of reference pillars required for 1 km. as per drawings given and direction of e/iof e/i providing & fixing of working benchmark pillars 2 nos. per km & 6 nos. of reference pillars required for 1 km. as per drawings given and direction of e/iof e/i providing & fixing of working benchmark pillars 2 nos. per km & 6 nos. of reference pillars required for 1 km. as per drawings given and direction of e/iof e/i clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i excavation for roadway in soi
Sector: Road development