The Military Engineer Services has published a tender for "PROVN OF LINK ROAD FOR LINKING OF GATE NO. 01 TO GATE NO. 02 OF EME BN AT YOL CANTT" on the 10 Apr 2024. This tender belongs to Road Construction category. This tender is published in Pathankot, Punjab location. The vendors interested in this tender and related Road Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Bus Bay Tenders | Road related beautification Tenders | Crash Barrier Repair Tenders |
Around 8306 tenders were floated in Punjab in the past month with major spending on unit paving Tenders, road construction Tenders, medicines Tenders
| Tender Title | PROVN OF LINK ROAD FOR LINKING OF GATE NO. 01 TO GATE NO. 02 OF EME BN AT YOL CANTT |
|---|---|
| Tender Description | excavating over areas, not exc 1.5 m deep and getting out in any type of soil, complete all as specified. excavation in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sqm on plan and not exceeding 1.5 mtr in depth and getting out in any type of soil, complete all as specified and directed. all as per srl item no 2.00 above but depth exceeding 1.5 mtr and not exceeding 3.0 mtr. returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm, complete all as specified and directed. removing excavated material not exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point , complete all as specified and directed. removing excavated materials/ soils, to a distance exceeding 250 mtrs but not exceeding 500mtrs and depositing where directed , complete all as specified and directed. removing excav |
| Comments | excavating over areas, not exc 1.5 m deep and getting out in any type of soil, complete all as specified. excavation in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sqm on plan and not exceeding 1.5 mtr in depth and getting out in any type of soil, complete all as specified and directed. all as per srl item no 2.00 above but depth exceeding 1.5 mtr and not exceeding 3.0 mtr. returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm, complete all as specified and directed. removing excavated material not exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point , complete all as specified and directed. removing excavated materials/ soils, to a distance exceeding 250 mtrs but not exceeding 500mtrs and depositing where directed , complete all as specified and directed. removing excav |
| Published Date | |
|---|---|
| Due Date | 06 May 2024 00:00:00 |
| Estimated Value | 16.7 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |