Details: survey and investigation1.2.3.4.5.6.7.8.9.engineering using total station / dgps or any otherlatest survey instruments for roads pipelines etc.including the carriage way or the linear structure and 5meters on either side if possibleengineering and location survey for with by use ofdifferential geographical positional system (dgps) andtotal station including taking final area of land andcarrying out profile and grid survey at 20m x 20m. gridand plotting the contour map of 0.5m contour intervalas directed by the engineer-in-chargepreparation of area contour plans and marking roadlevels on it in geographical information system (gis)format in utm wgs 84 grid format of the abovementioned item no 2engineering and location survey for with by use ofdifferential geographical positional system (dgps) andtotal station including taking final area of submergedland upto 7 meters and carrying out profile and gridsurvey at 20m x 20m grid and plotting the contour mapof 0.5m contour interval as directed
Sector: Forest and Environment