The Military Engineer Services has published a tender for "PROVISION OF PERIMETER ROAD ALONG THE BOUNDARY WALL AT RAMESWARAM" on the 22 Apr 2026. This tender belongs to Road Related Works category. This tender is published in Visakhapatnam, Andhra Pradesh location. The vendors interested in this tender and related Road Related Works tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | road and drain Tenders | road and bridge Tenders
Related categories: Drain and bridge Tenders | Road and building Tenders | Road Related Works Tenders |
| Tender Title | PROVISION OF PERIMETER ROAD ALONG THE BOUNDARY WALL AT RAMESWARAM |
|---|---|
| Tender Description | m&l for site clearance by cleaning away all shrubs, grass vegetation, bushes, , sapling and trees n exc 30cm girth, measures at a height of one metre above ground level, useful material shall be stacked and /useless materials disposed off upto a distance outside periphery of the area under clearence and burnt or otherwise disposed off as directed. roots of trees and saplings shall be removed by digging out roots upto 60cm below the ground level or 15cm below formed in the ground while digging out of roots shall be carefully filled up with earth, well rammed and levelled. boulders which may interfere with the work shall be removed, after breaking down if necessary complete all as specified and directed. surface excavation n.exceeding, 30cm deep and averaging 15 cm deep and getting out in soft/loose soil all as specified and as directed. surface excavation n.exceeding,30cmdeep and averaging 15cm deep and getting out in hard/ dense soil all as specified and as directed. surface excavat |
| Comments | m&l for site clearance by cleaning away all shrubs, grass vegetation, bushes, , sapling and trees n exc 30cm girth, measures at a height of one metre above ground level, useful material shall be stacked and /useless materials disposed off upto a distance outside periphery of the area under clearence and burnt or otherwise disposed off as directed. roots of trees and saplings shall be removed by digging out roots upto 60cm below the ground level or 15cm below formed in the ground while digging out of roots shall be carefully filled up with earth, well rammed and levelled. boulders which may interfere with the work shall be removed, after breaking down if necessary complete all as specified and directed. surface excavation n.exceeding, 30cm deep and averaging 15 cm deep and getting out in soft/loose soil all as specified and as directed. surface excavation n.exceeding,30cmdeep and averaging 15cm deep and getting out in hard/ dense soil all as specified and as directed. surface excavat |
| Published Date | |
|---|---|
| Due Date | 21 May 2026 00:00:00 |
| Estimated Value | 4.17 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |