The Pradhan Mantri Gram Sadak Yojana has published a tender for "Construction of HL RCC Bridge over Bhutahi Balan river in Parsa to gorgama path" on the 26 Sep 2025. This tender belongs to Bridge Construction category. This tender is published in Patna, Bihar location. The vendors interested in this tender and related Bridge Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: bridges Tenders | all civil works Tenders | construction of bridge Tenders
Related categories: Barrage cum Bridge Tenders | Airport Runway Repair Tenders | Road Paving Tenders |
PMGSY issued 1,411 tenders for Bridge Construction last year
With, 97 floated just last month.
| Tender Title | Construction of HL RCC Bridge over Bhutahi Balan river in Parsa to gorgama path |
|---|---|
| Tender Description | construction of hl rcc bridge over bhutahi balan river in parsa to gorgama path earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (upto 3.000 m depth) providing and constructing temporary island 24m diameter for construction of well foundation for 8m dia. well. assuming depth of water 1.0 m and height of island to be 1.25m including royalty for earth for each island. providing service road etc. all complete job as per specifications and direction of e/i. providing steel liner 6 mm thick for piles including fabricating and setting out as per detailed drawing. bored cast-in-situ m35 grade r.c.c. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. dismantling of existing |
| Comments | construction of hl rcc bridge over bhutahi balan river in parsa to gorgama path earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (upto 3.000 m depth) providing and constructing temporary island 24m diameter for construction of well foundation for 8m dia. well. assuming depth of water 1.0 m and height of island to be 1.25m including royalty for earth for each island. providing service road etc. all complete job as per specifications and direction of e/i. providing steel liner 6 mm thick for piles including fabricating and setting out as per detailed drawing. bored cast-in-situ m35 grade r.c.c. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. dismantling of existing |
| Published Date | |
|---|---|
| Due Date | 09 Oct 2025 00:00:00 |
| Estimated Value | 11.36 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |