Details: preventive and breakdown maintenance of pulsed nd:yag nanosecond opo laser system (purchased under p.o. no.: dps/04/iee/18202/po/177594/fe dt 13/06/2006). company's service engineer/s must attend 3 nos. of service calls in the period of amc (1 year). they can be called either for preventive maintenance or breakdown maintenance depending upon the requirement. preventive maintenance call: - 1. cleaning of optics 2. alignment of optics 3. replacement of optics 4. replacement of pockell cell. 5. tuning of harmonic crystal. 6. replacement of flashlamps. 7. replacement of primary coolant. 8. replacement of deionizer cartridge and particle filter. 9. monitoring the heath of the power supply (such as contact problem, dry soldering etc.). 10. operation training to new user. 11. to check the operation of the laser system for all wavelength to obtain at rated output.
Sector: Research center