Details: innitial rehabilationclearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceab a innitial rehabilationproviding 37.5mm thick built up spray grouting after scrapping, cleaning the road surface applying tack coat using 3.00kg of bitumen for 10sqm and laying of one layer of 37.5mm thick by using 0.45cum of 25mm to 40mm grade bitumin for 10 sqm in each layer with 0.12 of 12mm size b.h.g. c.b chips as key stone for 10 sqm.spreading over and laying induding heating pouring, spreading bitumirl metal and chips and compacting with p.r.r including cost ,conveyance royalty taxes of all required metterials,hire and running chsrges of mechinaries t&p etc complete as per direction of the engineer-in-charge a innitial rehabilationpainting two coats including primer coat after filling the surface with syn
Sector: Road development