Details: mrl40-sankari road to km 30.2 omalur -sankari road via vellakalpatti ,murugan kovil,sithankadu and palathottam km 0/0-3/0 clearing and grubbing road land including uprooting wild vegetation,grass ,bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per mord technical specification clause 201. km 0/0 - 3/0 scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. km 0/0 - 3/0 construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead
Sector: Road development