Details: scaffolding :supplying and fixing of scaffolding charges including cost& conveyance of all materials such as casurina poles, bamboos, bamboos mat and coir ropes etc, including labour charges etc, completeremoval of trees: cutting and removing palmyrah trees including stacking of girth 30 to 100 cm including cost of all materials and labour charges etc, completeremoval of old dead lime/surkhi concrete 6" to 9" thick and disposal of unserviceable materials within 100 meters lead including cost of all materials and labour charges etc,complete finished item of as directed by the engineer-in- charge cleaning & washing of roof and make it ready for scientifically treatment to roof like using karakaya & jaggary water etc, completeproviding and laying lime concrete of (1:1.5:3)-prop. using 20mm hbg mc metal to a required slop to easy run of water to existing channel, rammed to achieve 100% compaction and finished with gur and belgiri treatment including rounding of junctions with a p
Sector: Museums