Details: repair works 15.28.2 : dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet od25883/2022_2023 : dismantling wind driven turbo ventilator with due care from ac sheet without damaging the ventilator including base mould and stacking of ventilator within the site and stacking of unserviceable materials within the factory premises as per direction of engineer - in-charge. od330673/2022_2023 : disconnecting and taking out existing exhaust fan with due care and handing over to client after cleaning for overhauling and taking back from client and painting and fixing back the existing industrial type exhaust fans including arrangement and providing for proper aluminum louvers (including cost of louvers) so as to prevent birds /rain water entry to inside of the press- with all accessories including all electrical connections without damaging the fan and stacking of unserviceable materials within factory premise
Sector: Infrastructure