Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and disposal of within infopark phase i campus, as directed by engineer in charge dismantling tile work in walkway laid in cement mortar including stacking material within infopark phase ii. for thickness of tiles above 20 mm and up to 40 mm taking out rcc cover slabs of size upto 1sqm and shifting to infopark phase ii as per the direction of engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within infopark phase 1. all kinds of soil filling the areas with earth available at infopark phase i/phase ii campus including loading, conveyance