Description: DESIGN SUPPLY INSTALLATION TESTING AND COMMISSIONING OF WATER TREATMENT PLANT FOR LIFE TOWER APARTMENT AT PUNALUR KOLLAM INCLUDING 5 YEAR ANNUAL MAINTENANCE Name of Work DESIGN SUPPLY INSTALLATION TESTING AND COMMISSIONING OF WATER TREATMENT PLANT FOR LIFE TOWER APARTMENT AT PUNALUR KOLLAM INCLUDING 5 YEAR ANNUAL MAINTENANCE
Details: Design, Supply, Installation, testing and commissioning of water treatment plant (WTP) of 6,000 liters/hour capacity to meet the drinking water norms as prescribed by the Kerala water authority for 44 dwelling unit life apartments at Punalur on TURN KEY basis complete. Parameters of treated drinking water limits :1. Color - 5 (Unit Hazen) 2. Odour - Agreeable 3. Turbidity - 1 (Unit NTU) 4. pH at 25 ⁰C - 6.5 to 8.5 5. Total alkalinity (as C
Sector: Social Development