Details: renovation of anendeswaram kshethrakkulam 2.6.1. earth work in excavation by mechanical means(hydraulic excavator)/manual means over areas(exceeding 30cm in depth,1.5m in width as well as 10 sqm on plan) including disposal of excavated earth ,lead upto 50m and lift upto 1.5m ,disposed earth to be levelled and neatly dressed.all kinds of soil. 2.26.1. extra for every additional lift 1.5 m or part there of in excavation/ banking excavated or stacked materials.all kinds of soil. od.449/2023-2024. dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site. 5.9.1.centering and shuttering including strutting,etc. and removal of form work for: foundations, footings, bases of columns etc for mass concrete. 4.3.1 centering and shuttering including strutting, propping etc. and remo
Sector: RDPR