Details: electrification 1.10.3 : wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm frls pvcinsulated copper conductor single core cable in surface / recessed medium class pvc conduit,with modular switch, modular plate, suitable gi box and earthing the point with 1.5 sq.mm. frlspvc insulated copper conductor single core cable etc as required.group c od290197/2023_2024 : wiring combined plug point together with the light point/ fan point/ exhaust fan<br>point/ call bell point including 6 a 5 pin modular socket controlled by 6a one way<br>modular switch in the existing switch board and giving connection to the phase,<br>neutral and earth terminal with 1.5 sq.mm. frls pvc insulated copper conductor single core cable ( green wire for earthing) etc as required. 1.34 : supplying and fixing brass batten/ angle holder including connection etc. as required. od290209/2023_2024 : supply and installing b22 type 9w led bulb of 100 lumen/watt with pf 0.95.
Sector: Infrastructure