Details: schedule-a construction of tubewells at ersh,kvtr&vyta construction of tube well of 6 inch dia for casing/ strainer pipe(pvc screen slotted and ribbed screen casing pipes filled with pebbles,charcol and cocunut shell), by suitable method prescribed in is: 2800 (part i), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipments, tools,plants & machineries required for the job, all complete as per direction of engineer-in-charge, upto 100 metre depth below ground level. note : the rate includes clearing of site of all boring mud etc including all lead&lift,supply,filling,spreading&levelling stone boulder,gravel and levelling coarse,gravel packing in required grading and size as per actual requirement in accordance with is-4097 etc all complete development
Sector: Metro rail