Details: renovation of old godown dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 500 metres lead of :galvalume sheet dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 500 metres lead:of sectional area 40 square centimetres and above chipping cement concrete manually / by mechanical means including disposal of material within 500 metres lead as per direction of engineer - in-charge.nominal concrete 1:4:8 leaner mix demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 500 metres lead as per direction of engineer-in-charge.in cement mortar earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up t
Sector: Logistics and warehouses