Details: civil works engaging labour for cleaning and clearing works felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks andbranches, removing the roots and stacking of serviceable material and disposal of unserviceable material.above 240 cm girth hire charges of equipments for demolishing heavy concrete block, foundation etc., earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds ofsoil hire and running charges for tipper vertical load testing of piles in accordance with is 2911( part iv) including installation of loading platformand preparation of pile head or construction of test cap and dismantling of test cap after test etc.complete as per specification & the direction of engineer -in-charge.single pil
Sector: District Administration