Details: conference hall toilet od309134/2023_2024 : dismantling tile work in wall hold in cement mortar including stacking material within 50 metres lead.<br>for thickness of tiles above 25 mm and up to 40 mm 15.23.2 : dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles above 25 mm and up to 40 mm od309183/2023_2024 : dismantling european type w.c. of all sizes including disposal of dismantled materials<br>i/c malba all complete as per directions of engineer-in-charge od309186/2023_2024 : dismantling urinals of all sizes including disposal of dismantled materials<br>i/c malba all complete as per directions of engineer-in-charge od320771/2023_2024 : repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the ceiling complete, including disposal of to
Sector: Urban Authority