The LSGD Kerala has published a tender for "2023-24-EXTENSION OF HOMEO DISPENSARY-General Civil WorkPR NO 2" on the 14 Mar 2024. This tender belongs to Dispensary construction category. This tender is published in Ernakulam, Kerala location. The vendors interested in this tender and related Dispensary construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: Bank Building Construction Tenders | CTVS OT Repair Tenders | Fire Station Construction Tenders |
In Ernakulam district, Kerala, a total of 18 Dispensary construction tenders have been published, with 10 tenders released last quarter.
Tender Title | 2023-24-EXTENSION OF HOMEO DISPENSARY-General Civil WorkPR NO 2 |
---|---|
Tender Description | building 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 5.9.1:centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete 5.1.2:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggr |
Comments | building 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 5.9.1:centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete 5.1.2:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggr |
Published Date | |
---|---|
Due Date | 21 Mar 2024 00:00:00 |
Estimated Value | 6.52 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |