Details: dismantling of walls of any thickness made out of brick, laterite or rubble in cement mortar including stacking of serviceable materials for reuse at places pointed out and disposal of debris to the low lying areas in township within a lead of 150m as directed. dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. earth work excavation in all classes of soil except hard rock requiring blasting for foundation trenches, drains, column footings, equipment foundations etc. not exceeding 1.5m in width and 10sq.m on plan.including filling in basement by depositing on bank in layers with initial lead upto 50m and lift upto 1.5m, breaking clods, watering, ramming and / or filling in banks and sectioning of spoil earth etc.complete . hacking of cc flooring including cleaning the surface etc. complete as per direction of the engineer-in-charge. chipping and removing portions of existing rcc
Sector: Industries and Factories