Details: 2.6.1earth workexcavation by mechanical means(hydraulic excavator)/manual means over areas(exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan)2.8.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means side cutting 0d 8534/2019-2020 earth work in excavation by mechanical means (hydraulic excavator) /manual means inside cutting0d 8536/2019-2020 earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation60.7.1 dry rubble masonry - dru rubble without concrete levelling course masonry with good quality blased rubble including packing to compactness to lines and levels cost and onveyance of all materials labour charges etc.complete as perdirection of departmental officers at site.5.9.5 centering and shuttering including strutting, etc. and removal of form for:lintels, beams, plinth beams, girders bressumers and cantilevers4.1.5 providing and laying in position cement concrete of specified grade excluding the cost o
Sector: RDPR