The KWA Kerala has published a tender for "State Plan20252026 Construction of streel bridge" on the 26 Nov 2025. This tender belongs to Bridge Construction category. This tender is published in Ernakulam, Kerala location. The vendors interested in this tender and related Bridge Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: bridges Tenders | all civil works Tenders | construction of bridge Tenders
Related categories: Airport Runway Repair Tenders | Road Paving Tenders | Road Relaying Tenders |
Kerala has published 1,527 tenders in Bridge Construction in the last financial year.
Out of these, 99 were published last month.
| Tender Title | State Plan20252026 Construction of streel bridge |
|---|---|
| Tender Description | steel bridge material cost and working charges 15.18:dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. 10.2:structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. od105504/2025-2026:conveying the precast steel structure from workshop to site including loading unloading and all other safety mrasures od105505/2025-2026:providing arrangements for temporary support for pipes and holding the old structure while cutting and removing the damaged structure using cranes and other measures for replacing the beam 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of eng |
| Comments | steel bridge material cost and working charges 15.18:dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. 10.2:structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. od105504/2025-2026:conveying the precast steel structure from workshop to site including loading unloading and all other safety mrasures od105505/2025-2026:providing arrangements for temporary support for pipes and holding the old structure while cutting and removing the damaged structure using cranes and other measures for replacing the beam 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of eng |
| Published Date | |
|---|---|
| Due Date | 04 Dec 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |