Details: stabilization structure 0.75m height 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.all kinds of soil od1049/2024-202560.7.1. dry rubble masonry _ dry rubble without concrete levelling coursemasonry with good quality blasted rubble including packing to compactness to linesand levels cost and conveyance of all materials labour charges etc. complete as perdirection of departmental officers at site 5.9.1 centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete 5.22.6 steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more 5.1.2
Sector: RDPR