Details: malappuram district panchayat - construction of water storage unit 2.7.1:earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.ordinary rock 2.7.3:earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.hard rock (blasting prohibited) 4.1.8:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) od196774/2024-2025:providing and laying in position machine batched and
Sector: Infrastructure