Details: side protection work 2.32:clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.33.1:felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.beyound 30 cm girth up to and including 60 cm girth 60.1.2:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 60.2.2:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 15.3:demolishing r.c.c. work manually / by mechanical means inc
Sector: Irrigation