Details: road construction 3.15.2:compacting original ground<br> (ii) compacting original ground supporting subgrade<br> loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. od528866/2024-2025:filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. inlayers not exceeding 20 cm in depth, consolidating each deposited layer by ramming andwatering, lead up to 50 m and lift up to 1.5 m. 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.
Sector: RDPR