Details: maintenance of enclosure of zebra 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 15.19:dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of engineer -in-charge. od162100/2024-2025:dismantling old and damaged chain link from the cage including stacking material within 50 metres lead. 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 10.25.2:item shifted to sub head 14 as item 14.73item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying
Sector: PWD