Details: retaining wall 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth od486568/2024-2025:dry rubble masonry with hard stone,excluding through/bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc .complete. max. size of course aggregate not exceeding 2
Sector: RDPR