Details: road, drain & culvert od2174/2024-2025: scarifying the existing bituminous road to a depth of 150mm and its rolling with three wheel 80-100kn static roller to get required compaction as per the departmental officers at site including all labour charges hire charges etc complete ( based on mord 3.2 ) od8724/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) spreading in uniform layers on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408. <br>(ii) using gravel mix soil.(based on 4.11.2) 4.9:wet mix macadam providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth whe
Sector: Harbor