Details: drainage 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od299601/2024-2025:(od from mord 11.4.1.1)providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6(excluding form work) 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 ii. p.c.c grade m 15 (i) nominal mix (1:2.5:5) 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping
Sector: RDPR