Details: side wall construction 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od446958/2024-2025:dowel bars- supplying and providing dowel bars of size 16mm dia including drilling holes of 20mm dia to a depth of 1m (0.50m in rock and 0.50m in concrete) and filling the gap with cement grout (0.1kcomplet
Sector: RDPR