Details: dwss 10.25.2:item shifted to sub head 14 as item 14.73item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 13.61.1:painting with synthetic enamel paint of approved brand and manufacture to give an even shade:two or more coats on new work od469205/2024-2025:excavating trenches of required width for pipes, cables, etc including excavation for sockets,and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out theexcavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering, etc. and disposing ofsurplus excavated soil as directed, within a lead of 50 m:(modified 2.10.1.1)all kinds of soilpipes, cables etc.detai
Sector: RDPR