Details: detailed estimate 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 18.48:providing and placing on terrace (at all floor levels) polyethylene water storage tank :isi 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. 18.51.1:providing and fixing c.p. brass long body bib of approved quality conforming to is standards and weighing not less than 690 gms.15 mm nominal bore 18.53.1:providing and fixing c.p. brass angle valve for basin mixer and geyser points of approved quality conforming to is: 893115 mm nominal bore 50.17.1.1:supplying and fixing stainless steel soap dish including cost of materials and labour charges etc complete as per the direction of site engineer-
Sector: PWD