Details: road retarring 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od84842/2024-2025:filling with quarry muck &lt;br&gt; filling up low lying and water logged areas with localmaterial/ quarry muck, spreading in layers, leveling the top at site and consolidation byramming, etc complete for improving the cbr value of subgrade 4.9:wet mix macadam <br> providing, laying, spreading a
Sector: RDPR