Details: road 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 5.5.b.2a:modified macadam 75 mm thick using bitumen s-65 construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achi
Sector: RDPR