Details: road retarring 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od290215/2024-2025:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method complete as per clause 401.4 as per technical specification clause 408. <br>(ii) using gravel mix soil. (without roller compacting) 75.5.2.1pb:tack coat - with packed bitumen rates <br> providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic
Sector: RDPR