Details: building construction 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 20.6.1.1:vertical load testing of piles in accordance with is 2911( part iv) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-charge.single pile upto 50 tonne capacityinitial test 20.2.3:boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade m-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of
Sector: RDPR