Details: concrete road 3.15.2:compacting original ground<br> (ii) compacting original ground supporting subgrade<br> loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. od410212/2023-2024:filling with quarry muck-filling up low lying areas with local material/quarry muck, spreading in layers, leveling thetop at site and consolidation by ramming,etc.complete. 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) od411879/2023-2024:providing and fixing metal name board of size 120x60 cm size with 15 mm dia