Details: retarring and maintainance of road od246371/2024-2025:surface dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of ,lead upto 50m and lift upto 1.50m 75.5.5.a.1pb:modified macadam 50 mm thick using bitumen s-65 - packed bitumen rates <br> construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clause 506. 75.5.2.1pb:tack coat - with packed bitumen rates <br> providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503. 75.5.9.1.2pb:20mm thick open-graded premix carpet using bitumin
Sector: RDPR