Details: pond renovation 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared od150387/2024-2025:dismantling dr - dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. od150362/2024-2025:dr with departmental stone-dry rubble masonry with out concrete levelling course using dept rubble including packing to compactness to lines and levels labour charges etc complete as per the direction of dept officers od152780/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including pac
Sector: RDPR