Details: investigation work 8.16:reinforced cement concrete m-15 grade boundary pillars of standard design as per irc:25-19767, fixed in position including finishing and lettering but excluding painting . od58114/2024-2025:imposing the alignment to field measurement book and preparing la plan with the list ofsurvey numbers and extends of each plot to be acquired as per the direction of the engineer incharge including all cost of transportation, labour, preparing drawings with sufficient copies,collecting data etc complete. od58115/2024-2025:preparing junction improvement drawings with bus bays as per the direction of the engineer incharge including all cost of transportation, labour, preparing drawings, collecting data etccomplete. od58116/2024-2025:preparing alignment for the proposed road and drawing out a suitable alignment meeting allrequirements of indian road congress (irc). also satisfying the engineering aesthetic andeconomic requirement, designing of horizontal curves (wherever feasi
Sector: PWD