Details: tile paving 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.15.1:compacting original ground (i) compacting original ground supporting embankment loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per technical specification clause 301.4.1. 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader
Sector: RDPR