Details: appendix a: renovation of guest house 15.7.1:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in mud mortar 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 15.39.1:dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking with in 50 metres lead:upto 10 mm thick 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below 15.28.2:dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet 15.23.2:dismantling tile work in
Sector: Irrigation