Details: appendix a: reactive maintenance (initial rectification works) 3.11:removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.2:supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(irc 3.2.1.a) 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 55.7.a:providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 kg per m3 metal including all cost
Sector: PWD