Details: road formation 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od196341/2023-2024:dry rubble masonry _ dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of departmental officers at site 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix
Sector: RDPR