Details: building construction(civil work) 5.9.6:centering and shuttering including strutting, etc. and removal of form for:columns, pillars, piers, abutments, posts and struts 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 5.9.16.1:centering and shuttering including strutting, etc. and removal of form for:edges of slabs and breaks in floors and wallsunder 20 cm wide 5.9.5:centering and shuttering including strutting, etc. and removal of form for:lintels, beams, plinth beams, girders bressumers and cantilevers 5.9.2:centering and shuttering including strutting, etc. and removal of form for:walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. od31703/2024-2025:providing and laying in position machine batched and machine mixed design mix m-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, includin
Sector: PWD