Details: schedule of works and boq bill of quantities for civil works dismantling existing wall including hacking of the mortar base and sub layer and making good the floor surface to receive new floor finish, disposing of unserviceable materials from the campus as directed by the engineer-in-charge. dismantling of floor/wall tile including screed in floors laid in cement mortar and stacking of useful materials in the campus with disposing of unserviceable materials from the campus as directed by the engineer-in-charge. dismantling false ceiling including disposal of unserviceable material from the premises and stacking of serviceable material within 50 meters lead as directed by engineer-in-charge. carefully dismantling solid core flush paneled door/ aluminium windows with frame work causing minimum damage to wall jambs, taking out all hardware and fittings, finishing the openings to the new sizes specified, including removal of material within the premises, wherever specified. dismantling o
Sector: Electronics