Details: schedule a civil works clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. earth work in excavation by means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within the site as directed by the engineer- in-charge. all kinds of soil earth work in excavation by means (hydraulic excavator)/manual means over areas (exceeding 30cm in depth.1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m; disposed earth to be levelled and neatly dressed, as directed by the engineer- in-charge all kinds of soil. ordinary rock hard rock (blasting prohibited) earth work in excavation by means (hydraulic excavator)/manual means over areas (exceeding 30cm in depth.1.5m in
Sector: Infrastructure